After more than two weeks of rock hammering, enough rock has finally been cleared that we can stake out the house corners. Lots of rock still to be carted away, but footings can be poured next week. Click on pictures for a larger view.

We now have a flat spot for the basement slab. The rock debris to the right still needs to be removed.

Norris, and the builder's crew and excavator's crew trying to decide how to shift the garage doors and driveway around to make for easy turns into the garage.

Norris and Super-Dave the track-hoe operator watch Builder Tim and his helper Kyle staking out house corners

Tim measuring out the front side of the house.

The rock wall being built up to serve as retaining wall for the drive. At least we are putting some of our excavated rocks to good use. Another row of rocks still to be added.
No comments:
Post a Comment