Some of the flexible ductwork being installed in Cheryl's studio.Wednesday, January 30, 2008
Jan 29 Update
We arrived at the house to meet with the staircase designer, but found that the HVAC people were also there.
Some of the flexible ductwork being installed in Cheryl's studio.
Some of the flexible ductwork being installed in Cheryl's studio.Sunday, January 27, 2008
Jan 26
Progress this week on framing, plumbing, and the wall. Click on photos for a larger view.
Work continues on the chimney framing. Should be another day or two.
The lower retaining wall is completely done now.
Norris checks out the completed roof for the screened-in porch. The white band you see just below the roof is the trim the siding people were installing. We need to get the roof trim done before the shingles can go on.
This photo shows part of the great room. The area to the left is the dining room, and the kitchen is to the right. The pipes sticking up to the left of the sawhorses is for the kitchen island. In the corner to the right of the sawhorses you can see plumbing for the corner sink. All the plumbing is roughed-in now. You can also see the horizontal beams in the ceiling area, which are properly called collar-ties.
Work continues on the chimney framing. Should be another day or two.
The lower retaining wall is completely done now.
Norris checks out the completed roof for the screened-in porch. The white band you see just below the roof is the trim the siding people were installing. We need to get the roof trim done before the shingles can go on.
This photo shows part of the great room. The area to the left is the dining room, and the kitchen is to the right. The pipes sticking up to the left of the sawhorses is for the kitchen island. In the corner to the right of the sawhorses you can see plumbing for the corner sink. All the plumbing is roughed-in now. You can also see the horizontal beams in the ceiling area, which are properly called collar-ties.Tuesday, January 22, 2008
Update on Wall and Deck
Sunday, January 20, 2008
Jan 20 - Weather Has Slowed Things Down a Little
Another snap of cold weather and a bit snow has slowed things down a little. Since the last posting, most of the activity has consisted of removing and re-installing most of the windows due to the framers having installed a number of the casement windows in the wrong place. One window frame also had to be moved because it was too close to the fireplace. The other sign of progress is that the excess blocks have been removed from the lower retaining wall to taper its profile, it has been filled with re-bar and concrete, and the masons have started laying the stone. Click on photos for a larger view.
Although the shawdows here are pretty bad, you can see that the wall stone work is nearly done now.
Although the shawdows here are pretty bad, you can see that the wall stone work is nearly done now.Sunday, January 6, 2008
Jan 5 - Deck Work Started
Jan 3 - Snow Comes to the Mountains
Now that the holidays are over, work is starting up again at the house. Also, we had our first snow of the winter (only an inch or so), so we'll start with snow pictures of the neighborhood. Click on pictures for a larger view.
This was taken from the car looking down Reems Creek Rd towards the mountains where our new house is being built. Although there is only an inch of snow in the valley, the higher peaks always get more snow.
This was taken looking down Ox Creek Valley, towards the mountains where the rental house is where we are living now.
You can see the framers have installed some of the windows. Unfortunately, some are in the wrong place and are going to have to be swapped out. The upper windows are being custom made and won't arrive for another 3 weeks.
This was taken from the car looking down Reems Creek Rd towards the mountains where our new house is being built. Although there is only an inch of snow in the valley, the higher peaks always get more snow.
This was taken looking down Ox Creek Valley, towards the mountains where the rental house is where we are living now.
You can see the framers have installed some of the windows. Unfortunately, some are in the wrong place and are going to have to be swapped out. The upper windows are being custom made and won't arrive for another 3 weeks.
Subscribe to: