All the painters have moved to the front of the house and it looks like it won't be much longer till that side is done too. The lath for the stone has started to go up on the lower level.
All the painters have moved to the front of the house and it looks like it won't be much longer till that side is done too. The lath for the stone has started to go up on the lower level.
The more obvious progress was from the painting. Here you can see the darker color we picked for the horizontal lap siding now showing up on the bedroom wing of the house. The lighter color has just started to show up, on the panel below the lower window on the right side of the bedroom wing. You can also see the painters caulking and puttying on the Great Room wing of the house. You can also see the very small amount of progress on the chimney stone.
On the back side of the house, you can see both colors finished (well, one coat anyway) except the trim has not been painted its cream color yet.
Today we had two spray trucks and three crews working, so things were going a lot faster than yesterday.
Here you can see what a room looks like when the roof, exterior, and interior walls are completed. The interior wall (to the left) is insulated for soundproofing. This is part of the Master Bedroom.
This is a sequence that shows how the foam expands. Here the applicator has just sprayed a section of vaulted ceiling to his right. The foam comes out as a thin liquid that just seems to get the wood wet.
After he has sprayed, the applicator waits to see how the foams expands. This is after 1 second.
This is after about 3 seconds.
This is full expansion about 5 seconds after he sprays it on. The foam expands to 100 times its original liquid volume.
The painters are nearly done caulking and cleaning the siding, so one crew has started applying the light green color that goes on the vertical siding on the back of the house. With just one coat, its hard to see the difference in the light green to the right of the painter and the unpainted siding to the left. Hopefully we'll start to see what the colors really look like pretty soon.
This picture was actually taken a few days ago. The crew working on the upper part of the chimney has actually made a little bit of progress since this was taken.
The stone masons have also torn down the stone that was incorrectly put up on the chimney at the deck level (all the loose stones lying on the deck) and started to put up the right stone.
There were several other smaller things that got taken care of this week. Here you can see the doors on the garage side of the house were installed.
There was plenty of other activity as well. Here the grader is digging a hole for the 500 gallon propane tank in an area behind the house that he is pretty sure will be "soft digging." He soon found out (Big Surprise!) that it was too rocky. So we picked another spot in the front of the house that was mostly fill dirt, hoping there wasn't too much danger of hitting rock again.
Here he lowers the tank into the ground after finding a better spot in front of the house. We'll just have to landscape around it to hide the top bubble of the tank.
Here he works on the back side of the house doing some back fill and also digging up a spot where the foundation might be leaking.
The grader also did some work on establishing our front walk way and some space around the walk for landscaping. You can see one of the boxes of the wrong stone on the left. They were supposed to be picked up and the right stone delivered sometime today, but it hadn't happened by lunchtime when these pictures were taken.
These boxes contain some of the exterior stone that was delivered this week. Unfortunately, the delivery truck got stuck about 20 ft up the driveway, so he had to drop most of the load at the bottom of the drive.
The stone masons got started installing lath on the upper parts of the chimney via this somewhat precarious looking rigging. I'm not sure OSHA would approve.
One of the last remaining tasks before the framing inspection next week is to erect the steel column that runs from the basement floor all the way up to the roof ridge beam. This is done by bolting together a 10 ft section in the basement and a 24 ft section in the great room. They will eventually be wrapped in wood trim, but for now its just some really heavy steel. Here you can see it takes 8 guys to lift the upper section into place (5 below, 3 up). One of the primary goals was to not have the column fall through the front windows. Not sure what OSHA would think of this setup either.
Here the upper column is being mated to the lower column. The whole process took about 2 hours, which the guys accomplished without breaking any glass (or bones). Hats off to Steth & Todd's framing guys, who would really prefer working with wood than steel!
We also made our ceramic tiles selections this week. For the master bath, the rocks on the left are for the shower floor, and the tile to the right will be used for the shower walls and bathroom floor. The rock strip in the middle of the tile will be used for the accent band in the shower. The colors aren't exactly right since the camera doesn't like the flourescent lights at the showroom.
We selected this stone for the guest bath. The small tiles at the left are for the floor, the tile to the right is for the floor and shower wall, and the rock strip in the middle of the tile is the accent strip for the shower. These colors didn't come out accurately either. We also picked tile for the downstairs bath and for the foyer, but those colors were so far off we decided not to use those pictures.