Saturday, November 10, 2007

Floor Trusses Done

The roof trusses and lower level framing are all in place now, although some of the framing is just temporarily filling in for the Parallam columns which will arrive some time next week.

From this view, you can see the rough-in for the front doors and the two-foot cantilevered overhang for part of the second floor.


View from the driveway, looking in through the garage.


View from above shows all the trusses in place, with a gap in the middle for the stairs.