After concluding the house would not be ready for move-in tomorrow, we rescheduled our movers for Friday. The good news is that the power company showed up this morning to repair and dig-in the rest of the power line. Here Ronnie, our builder's project manager, watches as the power company crew splices in a length of new cable to make the run longer so it could be buried deeper. The even better news was that after they finished the cable, they installed our electric meter and switched us over to permanent power. The plumbers are supposed to come later today to power up the well and check our plumbing system for leaks.

The glass shower people showed up to install the glass walls for the shower in the master bath. Unfortunately, it didn't get cut to the right size and they had to order a new glass panel. Not sure when that will come.

The stone masons were able to get the front sidewalk finished this morning.

Lastly, the landscapers started doing what they could today, which consisted mostly of installing the wood steps going up the path that connects to the old logging road that goes almost to the top of the ridge line. We are putting in a total of 36 steps to get us past the steepest part of the slope and to help control erosion
No comments:
Post a Comment